Wednesday, June 29, 2011

Clarity

Ok so i had an onsite meeting with my SS and found out the error is a lot less than i thought. The facade of the house actually has kind of pillars of bricks between each window so the only part of the slab that had to be removed was the section under the window not either end as the bricks kind of wrap around and go back in and under the windows. The slab was boxed correctly and the waffles inside it are in the correct location. The frame is also in the correct location the only mistake was that the foam used to create the slab step down need to be a double under this window only. The windows inside the portico don’t have this problem. Big relief! But the funs no over yet.

If you examine the photos the termite protection hasn’t been replaced! These bricks are going to have to come back down.

My SS rang the pest protection install guys for me and they said that the protection can be side mounted with a more expensive fastener but that means the frame doesn't need to be disturbed to place the termi mesh under it.

DSCF3158DSCF3159DSCF3160DSCF3164DSCF3165DSCF3166

Now on to the other progress. Bricking has continued around the side. Only a little more on the south side, front facade and the window sills all the way around remain to be done.

DSCF3161DSCF3162DSCF3163DSCF3167DSCF3168

On to the build plan from here. The tiling will be done tomorrow and the grouting on Friday. while that is done inside on the outside the termite protection issue should be rectified and the bricking continued.
Hopefully the bricking will be finished on Friday as the weather is going to take a turn for the worst after the weekend.