I went past the block last night and the frame for the garage walls had been added and the kitchen was standing up rather than leaning against a wall in the living room.
Plus a lot of temporary cross braising had been added to support everything in preparation for the roof trusses to arrive. The issue in the toilet had been fixed. The parts that were in the backyard were actually the garage walls.
I checked the plan and the portico design shows that the bricked piers are pine beams encased in bricks. No sign of these yet.
Strangle the windows had been delivered and are in the back yard. Our SS had said they weren't due to arrive until next week? i hope they don't get stolen or damaged. At least the timber frame windows for the front of the house weren't there.
Friday, April 29, 2011
Wednesday, April 27, 2011
Frame going up
i think these are for the bricked piers of the alfresco. They are currently sitting in the back yard were the alfresco will go.
This is the only imperfection i have seen so far. the wall in the toilet is not directly over there markings on the slab.
Tuesday, April 19, 2011
Sunday, April 17, 2011
Connection
Shouldn't the piers connected to the slab in some way? i.e Rio?
Nothing coming out of them?
Nothing joining them?
Nothing coming out of them?
Nothing joining them?