I went for a walk around the house with my friend that is a brickie i got him to point out a few things that i should ask my SS about this week.


This is standing in the garage looking out at the back of the garage opening. My friend wanted to now how this will be finished.
DSCF3280Left SideDSCF3281Right

Maybe it has some architrave over it i though?

 

This is above the window in the bathroom. The gap is large and will need something filling it. Maybe a piece of steel?

DSCF3282DSCF3283

 

A few of the mortar lines need to be re-pointed on this Alfresco pole. No big deal.

DSCF3286


The sliding doors in the Alfresco need something fitted beside them as there is a gap to the bricks. Interestingly the same doors are used in the dining room and this gap isn’t present.

DSCF3287DSCF3288

 

The gas point is missing from the wall.

DSCF3289

 

Looking through the glass i can see that Lights are on the roof

DSCF3291

Down lights in the kitchen are installed too. Sorry the picture is very bad quality but my camera hates taking photos through glass.