Tuesday, December 14, 2010

Call from Metricon

I received a call from Metracon and hoped that it was for an appointment at Studio M. No such luck it was just to inform us that our CSC will be Rebecca and that our soil sample results were in and we had achieved a M-D wowhoo no extra money required :)

7 comments:

  1. 1 win, w00t!
    Have they said anything about site cut fees or anything yet?

    ReplyDelete
  2. said they were as estimated. :) they put aside 6K in the quote for them so we may get a little reduction hopfully.

    ReplyDelete
  3. Does that include a retaining wall? and does a retaining wall have to be completed before they'll make a start?

    ReplyDelete
  4. This comment has been removed by the author.

    ReplyDelete
  5. I dont think i will need one. Rebecca said my access test was a pass. does that include a test for that sort of stuff?

    ReplyDelete
  6. Hey Clinton, if they say your access test is a pass. Usually means they feel they'll have adequate access to the site for the duration of construction without having to charge you a levy to crane materials onsite or anything like that.

    You'd be very lucky to get any of the 6k in the quote back... Keep us all posted (sure you will)

    ReplyDelete